Wednesday, August 1, 2012

Pumping South Pool: Day 1


I checked out Day 1 of pumping at Twin Buttes South Pool.  Pipes were extended into the water (intake) and the Equalization Channel (outflow).  Pictures can be seen by scrolling through the document below:

South Pool Pumping Day 1

No comments:

Post a Comment